NIMS Training

April 24th, 2006

At work I was trucking on my Sollen stuff. I can see the light at the end of the tunnel and it is not a train! I had to go to the fire station at five-thirty so we could get to training at six o’clock. I did not want to leave because I was getting stuff done.

But we had training and we talked about the National Incident Management System as well as RIT teams and fire ground operations. It was a good training that took almost three hours when it was done. We did have a fire alarm call and a sick person call right when we were finishing up with the fire alarm call.

After the training we had a small shift meeting to talk about training we would like to do. Then I got back to my office and got cracking on my Sollen stuff. I am really in a grove. It is very slow going because of all the little things. It is like the house goes up fast, but the finishing work takes a long time. For this, the structure goes up fast, but making it actually work takes a while.

It was about four in the morning when I decided to finally get some sleep. I should be done with this tomorrow.


Trackback URI | Comments are closed.