Spring Break Slows Work at PFD

March 18th, 2009

I have been dealing with the engineer issue about me not being able to stay under the reserve guidelines. Brown and I talked about it for a while. He pretty much said that he knew that by setting the standards and not dealing with a couple of us who are engineers under the old system that we would get hosed. That is what happened. He said it sucks, but that is the way it is.

We got dispatched to a structure fire that turned out to be a cooking problem. It was burnt food, but it smoked up the apartment to the point where we had to ventilate it. While doing that I got an ambulance run. Our turn out smelled like the burnt eggs from the structure fire call it was nasty.

Later in the evening we got called to a fire alarm at the Child Care Center. The night janitor was not there. We cleared the alarm which turned out to be nothing. But we spent a while looking for the guy. We never were able to find him. We cleared it after being there for about an hour and went to bed.


Trackback URI | Comments are closed.