More Check offs

July 24th, 2008

I went to the fire tower with C-shift to work on some more check offs. We did vertical ventilation and set up the master stream with a five inch hose. That is all we did, but it took a while to get everything completed because we discussed stuff as we went along.


Trackback URI | Comments are closed.