Engineer Training with Victor

December 3rd, 2009

This morning I got ready for a trip to Pullman a day early. I was going to work with Victor. I went to Three Pigs to have lunch with Jon and the other guys.

Then I hit the road. It was a typical trip there. Nothing of note happened.

I got to Pullman and got ready for Victor’s training. I got some engineer calculations ready for him to do. Then I waited for him to get there. First we worked on the calculations. I helped him go through them.

We hit the road and drove around. We did about an hour and a half of city drive time.


Trackback URI | Comments are closed.